Production Workshop
Taikai Transformer Company's production plant is 77,000 square meters, of which the highly standardized, purified and dust-free assembly workshop covers an area of 25,000 square meters, using for the assembly of key components of transformer.
Taikai Transformer has two production lines, the first production line covers an area of 47,000 square meters, with assembly, coils, cores, insulation, welding, machining total of six workshops and a test hall, and other ancillary plants, to produce transformers up to 110kV. Daily it can produce 3 units transformers up to 110kV.
The second production line covers an area of about 30,000 square meters, mainly used to produce 220kV and above voltage level of all kinds of transformers, special transformers, and reactors, etc. Daily it can produce 1.25 sets transformers of 220kV and above, and dry 6 sets of transformers at the same time.
The workshop is equipped with four CNC laser system, CNC laser tube cutting machine, CNC insulation parts processing center, CNC lathe, CNC blunt machine, Germany Georg Cut-to-length line, CL00S Germany Welding Robot, laser position-seeking tank welding robot and other high-precision automated processing equipment.
Now the self-manufacturing products reach more than 95%. The main components such as tank, coil, core, body assembly can be completed independently, with an annual production capacity of 330KV and above up to 50 sets, 220KV and above up to 200 sets, 66-150KV up to 1000 sets, 35KV and below 200 sets of transformers. The annual production capacity can reach 160,000MVA.